Pricing plans
Pay per active tag per week. Unlimited users and projects, and your first 5 tags are free.
All plans are billed in Australian dollars.
Free
Starter plan
First 5 tags free for life.
- Unlimited users + projects
- Unlimited inspections
- Real-time status tracking
- Audit-ready reporting
- Day Dockets & Site Records
Standard
Standard plan
Only billed while on-hire.
- Unlimited users + projects
- Unlimited inspections
- Real-time status tracking
- Audit-ready reporting
- Day Dockets & Site Records
- Additional Access Tags $0.25 /week
Enterprise
Enterprise plan
Built for scale.
- Everything in Standard
- Rollout support
- Priority support
- Custom tags (optional)
Industrial scaffolding
Multiple access points?
Large industrial scaffolds often have several access points, and each one needs a tag showing the scaffold’s status.
Every scaffold has one Primary Tag at $1.50 AUD per active tag per week. Additional Access Tags are $0.25 AUD per active tag per week, and they all open the same scaffold record with the same inspection history.
Billing stops automatically when the scaffold is dismantled or an access point is deactivated.
Scafflinq vs plastic tags
Scafflinq
Plastic tags
Cost & billing
Tags supplied free, you only pay shipping.
First 5 tags free for life.
Inspections
Customisable digital inspection checklists with every inspection.
Automatic alerts & reminders for due/overdue inspections.
Special conditions kept in the scaffold’s inspection history.
Visibility & reporting
Live dashboards across projects and teams.
Head office sees every scaffold’s status in the web portal.
Proof & audit trail
Full inspection history stored and accessible online.
Photo evidence captured and attached to inspections.
Cloud-backed records (lower risk if a tag is damaged/removed).
Site Records
Day dockets signed by the customer on site.
Hop-up and tie movements with a signed handover.
Toolbox talks and incident reports.
Signed PDFs emailed and filed against the project.
Handovers & documents
Built-in handover certificate workflow.
Certificates can be generated and emailed automatically after inspection.
Attach engineering drawings & certificates to the scaffold record.
Tags & reliability
QR-enabled tags scannable with any phone camera.
Data stays secure even if the physical tag is damaged.
Start with 5 free tags
Start free with 5 tags. Scan, inspect, add photos and sign off, and your dashboard updates as you submit.


