60 checks across 11 sections, with a findings register and inspector sign-off.
- Scaffold details, intended use and reference documents
- Blank Yes / No / N/A responses and notes
- Corrective actions, reinspection and the recorded outcome
6 A4 pages · No account or email required · Version 1.0
Using the checklist
A starting point for inspecting supported scaffolds in Australia, with supplementary checks for loading platforms, B-Class hoarding and mobile towers. Use it with the site-specific design, manufacturer instructions and local requirements. It is not a complete checklist for suspended, hung, spur or cantilevered scaffolds.
- 1Identify the scaffold, inspection scope and reference documents before starting. Add site-specific checks where needed.
- 2Mark one response for each check: Yes if verified, No if not satisfied or unable to verify, or N/A if it does not apply. Explain N/A responses and unverified checks in the notes.
- 3Record every No response and unverified item in the findings register. Assess the risk, control access where necessary, and arrange corrective work through competent, appropriately licensed people.
- 4Where a defect creates a risk to health or safety, prevent use until corrective work and a competent person’s reinspection are complete. Record the outcome and communicate restrictions to the site team.
Choose the inspection schedule for the scaffold and site. Our Australian inspection frequency guide explains the regional requirements and when additional checks are needed.
What to check
Open a section to read the checks. The PDF includes the same numbered items, with response boxes and space for notes.
1. General and site conditions
9 checks
- 1.1Required scaffold identification, load information and access signs are present and legible.
- 1.2The scaffold matches the applicable design and manufacturer instructions, including approved alterations.
- 1.3Scaffold loads and the number of loaded platforms remain within the documented limits.
- 1.4Controls for nearby plant and vehicle movements are in place.
- 1.5Electrical hazards are controlled, including required clearances from live services.
- 1.6Excess gear is removed or safely stored, and rubbish and loose materials are cleared.
- 1.7People below and beside the scaffold are protected from falling objects and unauthorised access.
- 1.8Nearby crane and lifting operations are controlled to avoid striking or overloading the scaffold.
- 1.9Hazardous substances used or stored near the scaffold have suitable controls.
2. Ground, foundations and bases
6 checks
- 2.1The supporting surface is firm, stable and prepared to suit the scaffold design.
- 2.2The supporting structure remains sound and adequate for the scaffold and other imposed loads.
- 2.3Required soleboards are properly positioned, fully supported and secured against displacement.
- 2.4Soleboards are serviceable and of the material and size required for the loads.
- 2.5Baseplates and adjustable bases are serviceable, correctly seated and within the design limits.
- 2.6Excavations, drainage and ground movement have not undermined the scaffold support.
3. Ties and anchors
4 checks
- 3.1Tie locations and spacing match the applicable design or manufacturer instructions.
- 3.2Ties, anchors and their connections are secure, sound and free from unauthorised alteration.
- 3.3Required anchor testing and verification records are available for the installed arrangement.
- 3.4Anti-tamper fittings are installed where specified by the design or site requirements.
4. Structure and components
10 checks
- 4.1Components are sound, serviceable and suitable for the scaffold system.
- 4.2Components, fittings and locking devices are correctly connected, secured and tightened.
- 4.3Standards bear firmly on their intended supports.
- 4.4The scaffold is stable, with standards plumb or positioned as designed.
- 4.5Standard joints are positioned and staggered as required by the scaffold system or design.
- 4.6Ledgers and transoms are level or as designed, with the required spacing and connections.
- 4.7Required face, plan and other bracing is correctly positioned and secured.
- 4.8Hop-ups are correctly supported and installed at the heights specified for the arrangement.
- 4.9Tie bars are installed and secured where required by the scaffold system.
- 4.10Check couplers are correctly installed wherever required by the design or manufacturer.
5. Mesh and containment sheeting
3 checks
Complete where mesh, sheeting or other attachments are fitted.
- 5.1Mesh or sheeting is securely fixed and provides the required continuous coverage.
- 5.2The design allows for wind and other loads from sheeting and attachments, including retained water.
- 5.3Sheeting and its joints remain intact, without tears, loose fixings or unintended gaps.
6. Access and egress
5 checks
- 6.1Every platform has safe access and egress, with paths clear of obstructions, debris and loose materials.
- 6.2Access ladders are suitable, serviceable and correctly positioned and secured.
- 6.3Stairs, including stretcher stairs, have the required bolts, connections, landings and handrails.
- 6.4Step-ups and step-downs meet the applicable design, access and local requirements.
- 6.5Access openings, gates and hatches provide the required fall protection.
7. Edge protection
4 checks
- 7.1Guardrails and midrails are secure and at the required heights and spacings.
- 7.2Toeboards are secure, at the required height and continuous wherever required.
- 7.3Exposed edges and platform ends are protected, including at hop-ups and changes in level.
- 7.4Gaps between platforms and adjacent structures meet the applicable limits or have suitable protection.
8. Working decks
5 checks
- 8.1The number and locations of working decks match the intended use and design.
- 8.2Decks are at the specified heights, fully decked and without unintended openings.
- 8.3Planks, decks and lapboards are serviceable and properly supported.
- 8.4Infill boards and lapboards are secured against displacement using the specified method.
- 8.5Platform dimensions and load capacity suit the intended work and material handling.
9. Loading platforms
3 checks
Supplementary checks where a loading platform is installed.
- 9.1The loading platform matches its approved design, with load limits identified.
- 9.2Required double legs, lapboards, plywood and supporting members are correctly fixed.
- 9.3Plan and face bracing are fixed in accordance with the platform design.
10. B-Class hoarding
4 checks
Supplementary prompts only. Also use the engineered design and a hoarding-specific inspection procedure.
- 10.1B-Class hoarding matches its engineered design and any applicable site approval conditions.
- 10.2Required double legs, lapboards, plywood and supporting members are installed and secured.
- 10.3Plan and face bracing are installed as specified in the hoarding design.
- 10.4Counterweights, where required, match the design and are secured against movement or removal.
11. Mobile towers
7 checks
Supplementary checks. Complete the applicable core checks and follow the tower manufacturer’s instructions.
- 11.1Tower components are serviceable and suitable for the specified tower system.
- 11.2The tower is plumb and level on a supporting surface suited to its loads.
- 11.3Required bracing, stabilisers, outriggers or ties match the tower configuration.
- 11.4The tower has secure internal ladder access or another manufacturer-approved access system.
- 11.5Required guardrails, midrails and toeboards are fitted to the tower platform.
- 11.6Castors are secured, their locks work and the wheels are locked while the tower is in use.
- 11.7The operating area is clear of unprotected holes, overhead services and other obstructions.
Record what happens next
Use the findings register to connect each issue to its checklist number, location and photo reference. Record immediate controls, the corrective action, who is responsible and the result of reinspection. Add continuation sheets when you need more space.
The inspector records the outcome, any limitations and the next planned inspection.
For a handover, keep the checks with the Australian scaffold handover certificate and relevant drawings.
FAQs
Frequently asked questions
The printable checklist, its scope and how it fits with your inspection records.
The PDF includes 60 checks, scaffold and inspection details, blank Yes / No / N/A responses, a findings register and inspector sign-off. It covers general supported scaffolds, with supplementary sections for loading platforms, B-Class hoarding and mobile towers.
Sources and version information
Adapted from Scafflinq’s default inspection checklist. Prepared 25 November 2026.
- Safe Work Australia: Guide to Scaffold Inspection and MaintenanceJuly 2014; inspection records and Appendices A and B.
- WorkSafe Victoria: Scaffolding industry standardDecember 2024; Parts 4, 8 and 9. Apply the requirements for the site’s jurisdiction.
Keep your inspection records connected
Keep the checks with the scaffold
Use Scafflinq for custom checklists, photos, reminders and signed inspection records. Start free with 5 tags.