Scaffold inspection software
for US teams

Record scaffold inspections, share status through QR tags and keep handovers and T&M tickets together. A mobile app for inspectors and a web portal for your office.

The Scafflinq app

On site with Scafflinq

From the first shift
to the site record

  1. Set up the job

    Create the project and scaffold, assign a tag and build your inspection checklist. US load class options labelled OSHA 1926 / ANSI A10.8 come preloaded and can be edited in the web portal.

  2. Record each inspection

    The inspector opens the scaffold in the mobile app, completes the checklist, adds photos and signs off. Start a new inspection when the work requires it, even if the next scheduled check is not due.

  3. Share the result

    Crews scan the QR tag to see the recorded status and inspection history. Supervisors review the scaffold register, and the inspection PDF goes to the project recipients.

US construction requirements

Build your process around
the work shift

Federal OSHA sets the construction inspection duty. Your state and project requirements also belong in the inspection plan.

  • Inspect before each work shift

    29 CFR 1926.451(f)(3) requires a competent person to check scaffolds and their components for visible defects before each work shift and after events that could affect structural integrity.1

  • Competence includes authority to act

    Under 1926.450(b), a competent person can identify existing and predictable hazards and has authority to correct them promptly. An app records the inspection; the person still makes the assessment.2

  • A daily reminder is not a shift check

    OSHA’s interpretation explains that a scaffold in use needs another inspection when work shifts change. Scafflinq’s calendar reminders support your process; arrange the actual checks around each shift and relevant events.3

  • Check the applicable State Plan

    Some states operate their own OSHA-approved safety programmes. Check the requirements for the state and work involved when setting up your checklist and inspection procedure.4

Sources & guidance
  1. OSHA: 29 CFR 1926.451(f)(3)
  2. OSHA: 29 CFR 1926.450(b)
  3. OSHA: inspection at a change of work shift
  4. OSHA: State Plans

All in one app

Inspection records and
the paperwork around them

  • Scaffold inspectionsUse your own checklist, photos and sign-off. Record the inspection against the scaffold so its history stays together across shifts.
  • QR scaffold tagsWorkers scan with a phone camera to see the scaffold’s status and last inspection, without an app or account. Signed-in team members carry out inspections.
  • Handover certificatesGenerate a PDF from the inspection with your company logo and wording. Email it from site, with client sign-off where you need it.
  • Scaffold registerSee scaffold locations, inspections and status in the web portal. Export the register to Excel for your project records.
  • T&M ticketsRecord extra work, labour and materials, collect the customer’s signature and email the PDF. In Scafflinq, this record is called a day docket.
  • Maya AI assistantDescribe your inspection observations aloud. Maya suggests checklist answers for the inspector to review before signing off.

Local terms

Familiar records,
kept together

Inspection log
Each scaffold has an inspection history. The scaffold register brings the locations and current statuses together for the project.
T&M ticket
A time-and-materials record for extra work. Use Day Dockets to capture the work, crew hours, materials and customer sign-off.
Toolbox talk
Record the safety briefing and attendee signatures in the app, then email the PDF to the project recipients.

Testimonials

What teams say
about Scafflinq

  • Vicky Amato

    Australian Scaffold

    Scafflinq has made our inspection and compliance processes faster, clearer, and far more efficient. It’s been a great tool for improving visibility across our projects and ensuring everything stays up to date.

  • Daniel Lake

    Elevate Access Solutions

    Scafflinq has been a game changer for our Inspections and Handovers, all our scaffolds on one platform makes it very easy to manage. Our customers love it, it makes our operation a lot more efficient.

  • Andres Van der Welt

    Rohrig Constructions

    Thanks to Scafflinq, we never have to worry about losing inspection records again. It’s always there, ready for us to access.

  • Shane Youssef

    FC Building

    Scafflinq has revolutionized the way we track scaffold inspections. It’s simple, easy to use, and gives us complete peace of mind.

  • Kate Paterson

    Melbourne Scaffold Solutions

    This innovation allows us to efficiently hand over scaffolds and keep meticulous track of inspections.

  • Isi Talanoa

    Proview Scaffolding

    Scafflinq has made scaffold handovers more efficient and helps us keep accurate, up-to-date records of every inspection.

  • Al Ibrahim

    Buildum Construction

    Scafflinq is a must-have for any builder serious about safety. It’s easy to use and gives us complete visibility into our scaffolding structures.

  • Mohamed Trad

    Phoenix Developments

    Scafflinq has made our scaffolding site safer than ever. It’s a reliable solution that we can trust.

  • Roi Cifti

    Richard Crookes

    With Scafflinq, I can access scaffold inspection history from anywhere, anytime. It’s a game-changer for our business.

  • Kurt Vengers

    Dartanyon Developments

    Scafflinq has saved us countless hours of paperwork and admin. We can now focus on our core business knowing that our scaffolding is always safe and compliant.

Pricing & setup

Pricing and getting started
in the United States

First 5 active tags free

Estimates in USD. All plans billed in AUD.

Primary tagOne for each separate scaffold
$1.00 USDper active tag / week
Extra access points on one scaffold?

Useful for industrial scaffolds with several access points. Optional Additional Access Tags open the same scaffold record.

Additional Access TagExtra access points on the same scaffold only
$0.17 USDper active tag / week

Start with one project

  1. Sign up and order tags

    Create your company account and order your first boxes of tags during sign-up.

  2. Set up your first project

    Review your inspection settings, invite your team and create a project.

  3. Add and inspect your scaffold

    Once your tags arrive, scan a tag in the mobile app, enter the scaffold details and complete your first inspection.

Exchange rates published . Prices exclude GST.

FAQs

Frequently asked questions

Practical answers for US scaffold contractors and site teams.

Yes. Scafflinq supports scaffold inspections, QR tags, handover certificates and site records. US load class options come preloaded, and you can edit the duty ratings and inspection checklist in the web portal to suit the work.

Try Scafflinq on your next US project

Start with 5 free tags, or book a demo of the inspection and site-record workflow.